In a petrochemical industry facility in the Czech Republic, there arose a need to simplify and clarify the disconnection of incoming cables within the medium-voltage distribution system. The existing solution was not optimal from a maintenance perspective, and interventions in the cabling were time-consuming and operationally complex.
The customer required a solution that would enable fast, safe, and unambiguous separation of cable routes, with an emphasis on operator safety and access control.
14. September 2018