At a district heating plant in the Czech Republic, it was necessary to provide a safe and reliable disconnection of the electric boiler technology directly at the generator output. The solution had to operate in an outdoor environment, withstand high currents and short-circuit stresses, and at the same time allow manual operator intervention in emergency conditions.
29. March 2018